Metallic Constructions
Prefeito Pedro Ernesto Bridge
2014
Rio de Janeiro,Brazil

Infrastructures
Prefeito Pedro Ernesto Bridge
Client
Consórcio Transcarioca Rio
Wieght
1,750 t
Intervention
Martifer Metallic Constructions was responsible for supplying and assembling the metal structure.
The arch of the structure weighs around 500 tonnes and is divided into 12 sections with diameters ranging from 2,5 metres to 4,5 metres. It is 150 metres long and 33 metres high.
Share project on


