Metallic Constructions

Prefeito Pedro Ernesto Bridge

2014
Rio de Janeiro,Brazil
Martifer Group
Infrastructures

Prefeito Pedro Ernesto Bridge

Client
Consórcio Transcarioca Rio
Wieght
1,750 t
Intervention

Martifer Metallic Constructions was responsible for supplying and assembling the metal structure.

The arch of the structure weighs around 500 tonnes and is divided into 12 sections with diameters ranging from 2,5 metres to 4,5 metres. It is 150 metres long and 33 metres high. 

Share project on
Martifer Group
Martifer Group
Martifer Group
Trust Us