Metallic Constructions

Plock Viaduct

2007
Plock,Poland
Martifer Group
Infrastructures

Plock Viaduct

Client
Budimex – Dromex
Weight
4,260 t.
Intervention

Martifer Metallic Constructions is responsible for the steel structure of the Solidarity Bridge, which is 1,700 metres long.

Share project on
Martifer Group
Martifer Group
Go Up
Trust Us