Metallic Constructions
Old Oak Common Station
Ongoing
London,United Kingdom
Infrastructures
Old Oak Common Station
Project
Ongoing
Client
Balfour Beatty VINCI SYSTRA (joint venture)
Weight
1,545 tonnes
Intervention
Martifer Metallic Constructions will be responsible for supplying and erecting the steel structure for the passenger platforms on the Great Western Main Line and the Shared Accommodation Building at Old Oak station as part of the High Speed 2 (HS2) project.
The package awarded consists of 1,545 tonnes of steel structure. It includes the access corridors from the station to the platforms, as well as the stairs, lifts and their canopies. In addition, the metal-framed gantries of the SAB building are included.
Share project on
Go Up