Metallic Constructions
Mareterra
2022
Anse du Portier,Monaco

Residential and hotels
Mareterra
Client
Engeco
Project Owner
J. B. Pastor
Architecture
Renzo Piano Building Workshop
Weight
820 t
Intervention
The project includes the manufacture, supply and assembly of 820 tonnes of metallised steel structure for the welded reconstituted profiles (PRS) of the balconies and for the cantilevered steel structure attached to reinforced concrete. Martifer Metallic Constructions is also responsible for supplying and assembling the emergency staircases providing access to the buildings.
Share project on



projects
Metallic Constructions
Stories
Go Up