Metallic Constructions
Abi Bakr bridge
2017
Riyadh,Saudi Arabia
![Martifer Group](/_next/image?url=https%3A%2F%2Fmartifer.com%2Fmultimedia%2Fmartifer%2Fen%2FEATtQv1y-AbiBakrBig.jpg&w=3840&q=75)
Infrastructures
Abi Bakr bridge
Owner
ADA – Arriyadh Development Authority
Client
YUKSEL
Weight
3.500 t
Scope
Supply, fabrication, painting, transportation and assembly of the structural steelwork for the Abi Bakr bridge with 10 meters height, 300 meters long and 7 spans.
Share project on
![Martifer Group](/_next/image?url=https%3A%2F%2Fmartifer.com%2Fmultimedia%2Fmartifer%2Fen%2FWPf0jl33-AbiBakr_Dest01.jpg&w=3840&q=75)
projects
Metallic Constructions
Torre 30
Go Up